Dice Towers Installed

Rob Cameron

🪚 Build Updates

The day has come! The final coat of wax went onto the dice towers today, then they were assembled and installed. I used some of the left-over microsuede from the drawers for the holding area at the top and the pen at the bottom:

image

image

Here it is in action, and that sound!

Another shot of them rolling through the tumblers:

Now that the table is done I’ll take some beauty shots and do a full video walkthrough, probably this weekend. You may be able to notice from the photos that the newly waxed wood definitely sticks out compared to the surrounding surfaces! After a week or so the wax will loose some of its sheen and match the surrounding wood, but I’m going to put another coat on everything else, so it looks great for the photos.

image