Sunday was a big day for the cupholders! I’ve been nervous about drilling these huge (90mm, or 3 1/2”) holes: it’s a lot of wood to remove, does my drillpress have enough torque, can I hold them steady, will the walls be too thin and the wood will collapse or tear out…but today was the day to face the fears.

First I needed to actually make the huge blocks. I had a few leftover 8/4 chunks from the original resaw and I had just enough for 8 cupholders:

image

In my original design I have two cupholders on each end of the table as that’s just how the spacing worked out. I wondered if I could replace one of them on each end with something useful. I had a vision of a fold-out dice tower and figured the 6” wide block would be just enough room to contain one. I’m thinking it will fold down like the player stations, which would potentially double it’s height/depth.

But that’s for a future project. For now, it means that I only need 6 cupholders instead of 8. I glued up my longer scraps, which was just long enough to end up with 6 cubes of 4 1/2” length:

  • image
  • image
  • image

While those were gluing, I took some time with the shooting board to make sure the cupholders vertical supports were a perfect 90°:

  • image

I drilled holes for assembling the cupholder box, and drilled the corresponding holes in the base for attaching the cupholders:

  • image
  • image
  • image
  • image

By now the big block was ready for milling. First I planed one side to 5” wide, then sawed off one end to get the other down to 3 5/8”:

  • image
  • image

When it was time to cut them into blocks I had to make two passes to get all the way through the board, flipping it 180° each time:

  • image
  • image

Finally, it was time for The Drill:

image

I clamped the block to the fence to make sure it stayed steady. It took a while, and it makes a TON of wood chips, but I set my drill to the lowest RPMs (200) and just took my time:

And the hole fits amazingly well. So well, the inserts have a piston fit:

After all six were done I dry fit my pieces again, and sure enough, I had a cupholder module:

  • image
  • image
  • image

Finally, I cut a groove for the linear rail that the cupholder is going to slide on, and started doing some test fitting. I may end up doubling up on the rails and use two for each cupholder, just to make sure they’re stable and don’t have any side-to-side rocking when extended:

  • image
  • image