Leaves Installed!

Rob Cameron

🪚 Build Updates

Last night I applied a coat of Feed ‘n’ Wax and put the leaves on the table! I attached the steel C-channel to the undersides, and added a strip of 1/4” wide by 1/8” thick weather stripping to each edge. This is just one more layer of protection in case something spills on the table and it makes its way to the seams between leaves:

  • image
  • image

The leaves are definitely on the lighter side compared to the rest of the table, but I’m liking the contrast. They’ll darken over time, but will probably always remain a few shades lighter:

image

image

image

After re-making the play surface this weekend I’m going to work on the dice towers, and then this project is officially complete!

The past couple of weeks I’ve started thinking about matching chairs…I’ve got some ideas, so I might start working on those shortly after. After I take a little break from building! 😅

Start of Dice Towers

Rob Cameron

🪚 Build Updates

After the holiday break I figured it was time to get back in the shop and finish this table!

I started by adding dimension to my Sketchup model:

image

I found a piece of highly figured sapele at Saroyan a few months ago, and held onto it with any particular project in mind, but this one fits the bill! First up was cutting it down to rough size (and got to put the other half back on the wood rack for the future):

After jointing and planing I ripped it to rough width, with a big 45° angle on the top edge:

image

After some miter cuts I have an actual tower:

image

Gluing these up is made easy with the Blue Tape Trick to hold the miters tight while the glue sets (no glue yet, just a rough fit to make sure everything is square:

image

I pulled some scrap ebony off the rack to make the little tumblers that the dice fall on to help shuffle them:

image

The last job of the day was to glue a back to the base that actually gets attached to the table. The back is only 1/2” thick so I clamped it to some right angle blocks to make sure it set at 90°:

image

Tomorrow I’ll start gluing up everything else and installing hinges.

Dice Towers Continued

Rob Cameron

🪚 Build Updates

Yesterday was spent fitting the “frame” of the tower to the table itself:

  • image
  • image

And cutting mortises for hinges. The dice towers are going to be hinged in two places:

image

Each using a pair of hinges. I went with Brusso CB-301 hinges for all of them. The hinge needs a 3/4” long x 13/32” wide x 3/32” deep mortise. Trying to hold one of these tiny hinges against the wood and trace around it is near impossible. But a marking gauge makes it easy. Set the cutter to the the dimension you need by referencing the hinge itself, then transfer that to the board:

  • image
  • image

After some chisel work we’ve got a perfect pocket for the hinge:

  • image
  • image

About Hinges

Something to note about hinges: there are two ways you can mount them. You can make them flush the surface and have the barrel (the round edge of the hinge containing the pin) completely exposed. When closed the two halves sit together nicely, but when you open them there will be a small gap between the two pieces. You can see that here in my tool chest:

image

If you’re doing big doors like this that’s totally fine. But if you want the two halves to rotate perfectly on their corners and have no gap, you need to mortise the hinge a little deeper than normal so that the rotation point of the two halves is the center of the hinge pin:

image

And to do that you just need to make sure you’re setting the marking gauge to that point at the center of the pin, not just to the size of the hinge leaf itself. Now the two rotate exactly on their corners:

image

More Dice Towers

Rob Cameron

🪚 Build Updates

I missed an update last week!

Two Weekends Ago

After another set of hinges were cut (the top to the back):

  • image
  • image
  • image

After that I was able to fit a test out the enter mechanism:

This Weekend

I finished up the actual tower of dice towers:

  • image
  • image

I also built the “fence” that keep the dice contained after falling through the tower:

  • image
  • image

The last major part of the tower is the “holding area” at the top. I saw this being a place to put your dice between rolls. I set up some fences on the router table so I could accurately route a “tray” for the dice:

  • image
  • image
  • image

Now, when the tower is open, there’s a lot of weight out front that tries to try and pull the tower closed. The holding area cantilevers out the opposite side:

  • image

But it’s not nearly as heavy as the weight of the tower out front. But, I planned for this! I routed some extra depth and added lead weights. These are the weights used at the tire shop to balance your wheels!

  • image
  • image

Adding 20 weights (10 oz.) gives the top enough weight to easily hold the tower open!

The last piece of the puzzle was attaching the tower to the back. I decided to attach it via dowels. I drilled holes in the back of the tower and then used dowel centers to mark their locations on the back:

  • image
  • image
  • image

Once the matching holes were drilled I clamped the tower to the back:

  • image
  • image

Here’s the closed mechanism, where you can see the tower nesting inside the fence at the bottom. This is the reason I went with 45° miters on the top of the tower and sides of the fence: so they can nest inside of each other, maximizing the height of the tower itself:

image

There’s about a 1/16th inch to spare!

After a bunch of sanding, they’re ready for finish!